Project Profiles
The project specified the application of Nukote ST (Pure Polyurea) over newly poured concrete. The client’s construction schedule required immediate coating after casting. Nukote HLT followed by Newkote EP Prime II was applied to eliminate [ + ]
Parking Deck of Salvador Airport
Project: Surface protection and waterproofing of the new parking deck at Salvador Airport Luis Eduardo Magalhães, Bahia, Brazil. Date: Nov 2015 – Mar 2016 A new parking deck level was included in the expansion project of the airport. This [ + ]
Wilcox Tunnel Rehabilitation
Date: Nov 2015 – Mar 2016 Description: Nukote was engaged in this projectat the request of the clients consulting engineers. We visited the site on several occasions and worked directly in the specification development with the consultant [ + ]
Hunts Point Compressor Station
Location: New York Date: November 2015 Description: This project was initiated as atrial resulting from third party laboratory testing of Nukote Coating Systems products in 2012. Operations Technology Development (OTD) is an organization [ + ]
Medupi Power Plant South Africa- PDRT tanks 4401A & 4401B
Demineraliazed water was entering the 2 numbers of PDRT tanks at maximum 95 degrees C. The floor / base substrate was concrete. The vertical walls where coating were terminated is Stainless Steel. Nukote HLT, Nukote Chemshield TS 500 [ + ]
Motorola Manufacturing Plant Malaysia
Industry: Potable Water Tank Waterproofing Purpose Client: Motorola Malaysia Sdn Bhd Distributor: Nukote Industries Malaysia Contractor: Nukote Industries Malaysia Project: Metal Tank Repair Job Location: Bayen Lepas, Penang Malaysia [ + ]
City of Dreams Belle Grand Casino
Location: Manila Date: 2014 Scope: PODIUM POOL AREA G ARDEN AREA TOWER ROOF DECK WATER TANK DECK NOBU POND AREA COOLING AREA Area: 30,000 square meters Project Description: Located in the entertainment district along Manila Bay, City of [ + ]
Aydoghmoosh Water Transmission Line
This direct burial external pipeline coating project, was installed under both harsh rocky terrain and river crossing conditions in a remote Middle East location. The project consisted of large 94” diameter pipe weighing 21 tons per 12 [ + ]
Masjid At-Taqwa Miri, Malaysia
Industry: Waterproofing Purpose Client: Masjid At-Taqwa Consultant: Jabatan Kerja Raya Miri Sarawak Distributor: Nukote Industries Malaysia Contractor: Syarikat Ellu Bersatu Sub-Contractor: Prima Excellent Enterprise Company Project: [ + ]
Prince Khalifa Bin Salman Recreational Park
Nukote Coating Systems were specified in the original design drawings by the Architect who had experience with our products on previous projects in the Middle East.The system specified was a composite elastomeric system applied to a [ + ]